As part of Laura's campaign for a bridge over the Thatcham level crossing, she went to visit the Colthrop site and meet with the signal control box manager to discuss the issue.
Speaking about the visit, Laura said:
"The staff at the control box confirmed that the crossing is closed for longer than other level crossings, with waits for drivers of up to 30 minutes. It is clear that a bridge is the most viable solution, and I will be seeking to assess the most appropriate location for this."